Enquire online 24/7 · On site 7am–6pm
Salisbury · Wiltshire

Solar, Battery & Electrical Servicesin Salisbury & Wiltshire

From the cathedral close to Bishopdown, Harnham and the villages along the A36 towards Wilton and Amesbury, we design, install and certify solar, battery, EV charging and electrical work for Salisbury homes and smallholdings, with a fixed written quote typically within 48 hours of survey.

25 years as a qualified electrician · MCS-qualified for solar PV and battery installation · NAPIT and RECC registered · 0% VAT on solar and battery · 2-year workmanship guarantee.

Local coverage

Selenium Energy in Salisbury

Salisbury sits roughly 25 miles west of our Winchester base along the A36, a drive that runs through the Wiltshire chalk downland and the Test and Wylye valleys before dropping into the city beside the water meadows and the cathedral spire. We already carry out solar, battery and electrical work across the city and the wider district, from the terraces near the station to the newer estates on the outskirts and the smallholdings scattered through the surrounding parishes, and Salisbury is a regular part of our working week rather than an occasional trip out.

That A36 route is a straightforward one, so a Salisbury visit adds a predictable amount of travel time rather than an unpredictable one: useful when you are trying to book a survey date or plan an install day around work or family. Most solar, battery and EV charger jobs in and around Salisbury are still completed within a single working day once the survey and paperwork are done, the same as work closer to Winchester. Where a job needs a distribution network operator application, typically for a larger battery or a supply upgrade on an older rural connection, we factor the DNO's own timescale into the schedule from the outset so there are no surprises.

We have worked on the property types that make Salisbury what it is: pre-1919 stone and brick terraces close to the cathedral close and around Fisherton and Milford, the mock-Tudor and interwar semis of Harnham and Bishopdown, 1960s and 1970s estate housing further out towards Bemerton Heath, and newer developments on the city's edges. We are equally familiar with the rural end of the district: farmhouses, converted barns and smallholdings around Downton, Wilton and the villages towards Amesbury, many of which are on single-phase rural supplies that need a properly considered electrical design rather than a standard suburban specification.

The most common enquiries we get from Salisbury households are solar and battery installations on period stone or brick roofs where listed status or conservation area rules affect what can go where, EV charger installations for households commuting into Southampton, Bristol or along the A36 corridor, consumer unit upgrades on older Wiltshire properties that have never had an RCBO board fitted, and EICR safety inspections ahead of a sale, letting or mortgage. Emergency call-outs for tripping circuits or a lost supply are also a regular part of the work, and we take online enquiries around the clock even though on-site visits run 7am to 6pm, Monday to Saturday.

Salisbury at a glance

Base to Salisbury
Roughly 25 miles via the A36 from our Winchester base: usually under an hour's drive.
Typical quote turnaround
Fixed written quote usually within 48 hours of the free survey.
Install time
Most domestic solar and battery installs completed in a single day; standard EV chargers in a few hours.
Out of hours
Online enquiries taken 24/7; emergency call-outs available outside standard 7am–6pm hours.

Services we install in Salisbury

Every service we offer in Winchester is available in Salisbury and the surrounding Wiltshire villages, from solar and battery installations on stone and brick roofs in the conservation area to EV chargers on rural driveways and full electrical work on period and modern properties alike.

All-black solar panels installed across a period slate roof in Hampshire

Solar PV Installations

Solar arrays designed around the pitch, orientation and roof material typical of Salisbury's cathedral-city terraces and its surrounding stone and brick farmhouses, with panel positioning that respects listed and conservation area constraints where they apply.

Read more
Fox ESS inverter with twin battery modules mounted in a Hampshire garage

Battery & Storage

New battery systems and retrofits sized around real evening usage, useful in Harnham and Bishopdown households on time-of-use tariffs and on rural smallholdings that generate more than they use during the day.

Read more
Zappi EV charger installed beside a double garage on a Winchester driveway

EV Charger Installations

OZEV-authorised EV charger installs for commuters running the A36 towards Southampton or the A303 towards the M3, including rural properties with longer cable runs from the consumer unit to an off-street parking area.

Read more
Fox ESS inverter and battery wired alongside a Zappi EV charger with isolator on a rendered wall in Winchester

Electrician Services

General electrical work - sockets, lighting, extensions and outbuildings - carried out to the same standard whether the property is a Victorian terrace near the close or a modern estate house on the city's edge.

Read more
Electrical panel, isolators and inverter wiring installed on a brick wall in Winchester

Consumer Unit / Fuse Box Upgrades

Modern RCBO consumer units fitted and certified where an older Wiltshire property still has a dated fuse box, a common finding on pre-1919 stone and brick housing across the district.

Read more
Duracell inverter, generation meter and isolators neatly installed above two Duracell home battery units

EICR Safety Inspections

City & Guilds 2391 inspection and testing with a plain-English certificate, useful for Salisbury landlords letting period terraces and for buyers of older stone or brick property ahead of completion.

Read more
Electrical panel, isolators and inverter wiring installed on a brick wall in Winchester

Full & Partial Rewiring

Full and partial rewires planned around listed and pre-1919 construction methods found across the cathedral city and its conservation area, with daily tidy-downs and dust control as standard.

Read more
Fox ESS inverter and twin battery modules installed in a Hampshire garage

Smart Home & Energy Monitoring

Monitoring set up so Salisbury households can see exactly what a rural or suburban system generates, stores and uses, and schedule charging around the cheapest hours.

Read more
Solar PV panels fitted to a hipped tiled roof with scaffolding in place in Hampshire

Emergency Callout & Fault Finding

Fault finding and emergency call-outs for tripping circuits or lost power on both city properties and outlying smallholdings, diagnosed by an electrician of 25 years rather than a call centre script.

Read more

Why Salisbury households choose Selenium Energy

Salisbury is far enough from Winchester that residents reasonably ask whether a company based there will really turn up, know the area, and stand behind the work. Here is what we bring to the job.

A predictable A36 route, not a guess

The drive from our Winchester base to Salisbury runs a known route along the A36, so travel time is factored honestly into scheduling rather than promised and missed.

Direct contact with Steve throughout

You deal with Steve Higgins from enquiry to certification: the same person who surveys the roof or the board is the one who signs off the finished work.

Experience with stone and brick period property

Salisbury's pre-1919 stone and brick housing stock, much of it in or near the conservation area, needs fixing methods and panel layouts chosen with the building fabric in mind, and that is routine work for us.

Rural single-phase supply experience

Smallholdings and farmhouses around Downton, Wilton and Amesbury are frequently on older rural single-phase supplies, and we design around what the existing supply can actually carry, applying to the DNO where an upgrade is needed.

0% VAT and transparent pricing

Solar and battery installations carry 0% VAT and every quote sets out equipment, labour and any board or supply work as separate, clearly priced lines.

Certified, guaranteed work

All electrical work is certified to the 18th Edition of BS 7671 under NAPIT and Part P, backed by a 2-year workmanship guarantee and manufacturer warranties up to 30 years depending on brand.

What we see on Salisbury and Wiltshire properties

Salisbury's building stock and setting bring a distinct set of considerations, from the cathedral city's protected streets to the exposed farmland beyond the ring road.

Property types and building age

The city centre and the streets around the cathedral close are dominated by pre-1919 stone and brick construction, much of it listed or within the Salisbury conservation area, where roof coverings, rainwater goods and visible alterations are all subject to planning controls. Move out to Harnham, Bishopdown and Bemerton Heath and the housing shifts to interwar and mid-century semis and estates, with more straightforward roof structures and modern consumer units, though many still on their original wiring.

Beyond the city, Wilton, Downton, Amesbury and the villages along the A36 and A338 mix Victorian farmhouses, converted agricultural buildings and newer infill housing with genuinely rural smallholdings, some running outbuildings, stables or workshops off the same domestic supply as the house. Each of these building types calls for a different survey approach, and getting the fixing method, cable route and consumer unit specification right the first time matters more on older or listed property, where remedial work is disruptive and sometimes restricted.

Roofs, orientation and climate

Salisbury sits in the Avon valley at the confluence of several chalk streams, and the surrounding downland brings a different microclimate to the coastal towns we also cover: colder winter mornings, a higher chance of frost, and wind funnelling along the valley that needs accounting for in roof-mounted equipment fixings. Stone-tiled and clay-tiled roofs common on older property in and around the cathedral city need fixing systems matched to the tile profile rather than a generic clamp, and slate roofs on Victorian terraces bring their own handling requirements.

Orientation varies more in Salisbury than in a purely suburban town, because many rural properties and smallholdings have outbuildings and barns that can host a south-facing array even where the main house roof faces the wrong way. Mature trees around the water meadows and in village gardens can also shade a roof for part of the day, so we assess shading at survey rather than relying on satellite imagery alone, and we design array layout and inverter strategy around what the roof and its surroundings actually offer.

Grid and infrastructure

City properties are generally on modern three-phase or robust single-phase supplies, but rural Wiltshire is a different picture: smallholdings and farmhouses around Downton, Wilton and Amesbury are frequently on older single-phase rural supplies that were never designed for a battery, an EV charger and a solar inverter all drawing and exporting from the same connection.

  • Older single-phase rural supplies that need capacity checked before adding solar, storage or an EV charger
  • DNO applications submitted early for larger battery systems or supply upgrades, so timescales are built into the schedule
  • Off-street parking on gravel drives, farm tracks and shared rural accesses considered when routing EV charger cabling
  • Outbuildings, stables and workshops on smallholdings sometimes needing their own sub-circuit rather than sharing the house supply
  • Consumer units in older properties that predate RCBO protection and need upgrading before new circuits are added
  • Longer cable runs on rural plots factored into both cost and design rather than assumed to be standard

Conservation, planning and access

The Salisbury conservation area covers much of the historic centre, and a number of individual properties around the close and along the principal medieval streets carry listed status. Solar panels, external cabling and any change to roof coverings on listed buildings or within the conservation area may need planning consent or listed building consent, and we discuss this at survey rather than after a quote has been issued, so there are no surprises about what can and cannot go where.

Access is a second practical constraint: some cathedral close and city centre streets have restricted or no on-street parking and narrow pavements, which affects how equipment and scaffolding are brought to site and how long that takes. Rural properties bring the opposite challenge - long, sometimes unmade driveways, farm gates and shared accesses - which we account for when planning install day logistics so the visit runs to schedule.

How a Salisbury installation runs, step by step

The process is the same whether the job is a city terrace or a Wiltshire smallholding: the same electrician surveys, quotes, installs and certifies the work.

  1. 1

    Enquiry

    Call, email or send your details online. Steve responds personally and arranges a free survey at a time that suits you, whether you are in the city centre or out towards Amesbury.

  2. 2

    Free survey

    We assess the roof, consumer unit, existing supply and, on rural properties, the condition and capacity of the incoming single-phase supply, along with any conservation area or listed building considerations.

  3. 3

    Fixed written quote

    A clear, itemised quote is usually with you within 48 hours of the survey, setting out equipment, labour, any board or supply work, and the total at 0% VAT on solar and battery work.

  4. 4

    Paperwork and scheduling

    Where a DNO application, planning consent or listed building consent is needed, we submit or advise on it early and build the realistic timescale into your installation date.

  5. 5

    Installation day

    Most domestic solar and battery installs are completed in a single day; EV chargers usually take a few hours. Rural jobs with longer cable runs or outbuilding circuits are scheduled with the extra time already agreed.

  6. 6

    Commissioning, certification and handover

    Full testing to the 18th Edition of BS 7671, system commissioning and app setup, certification under NAPIT and Part P, and handover of warranty documents and our 2-year workmanship guarantee.

Salisbury questions, answered

Do you cover Salisbury?

Yes. Salisbury and the surrounding Wiltshire villages, including Bishopdown, Harnham, Laverstock, Wilton, Amesbury and Downton, are a regular part of our working area alongside Winchester and the rest of Hampshire.

How quickly can you get to Salisbury?

Our base is roughly 25 miles from Salisbury along the A36, usually under an hour's drive. Surveys are typically arranged within a few days of your enquiry, and installation dates are booked once your written quote is agreed.

How much does solar and battery installation cost in Salisbury?

Pricing is the same across our whole coverage area, quoted individually against your roof and supply. Recent installs include 10 panels with a Fox EP6 5.76kWh battery and inverter at £6,995, 13 panels with two Fox 5kW batteries at £8,500, and 12 panels with a Sigenergy 10kW battery and 5kW inverter at £8,900. Solar and battery work carries 0% VAT.

Is emergency call-out available in Salisbury?

Yes, emergency call-outs are available outside our standard 7am–6pm on-site hours, and online enquiries are taken 24/7 whether you are in the city or one of the surrounding villages.

Are you accredited to work on my property?

Steve is a qualified electrician of 25 years, MCS-qualified for solar PV and battery installation, with the company's MCS accreditation currently in progress. We are NAPIT registered under Part P, RECC registered, and OZEV authorised for EV chargers, with all work certified to the 18th Edition of BS 7671.

How long does an installation take once it starts?

Most domestic solar and battery systems are completed in a single day, and standard EV charger installs take a few hours. Rural properties with longer cable runs or additional outbuilding circuits are scheduled with extra time agreed in advance.

Do I pay VAT on solar or battery work?

No. Solar PV and battery storage installations currently carry 0% VAT, whether fitted together or as a retrofit to an existing system.

I'm a landlord with a property in Salisbury: can you carry out an EICR?

Yes. Steve holds City & Guilds 2391 in inspection and testing and provides a clear, plain-English EICR certificate suitable for landlord compliance, whether the property is a period terrace near the cathedral close or a more modern rental further out.

Can I get an EV charger fitted on a rural driveway?

Yes. We regularly fit EV chargers on rural properties around Salisbury with longer cable runs from the consumer unit to an off-street parking area or farm driveway, and we assess the run and any supply capacity questions at survey.

Can you add a battery to solar panels I already have on my Salisbury property?

Yes, battery retrofits to existing solar arrays, including systems installed by other companies, are a regular part of our work. We check your existing inverter and consumer unit at survey and quote the best route to add storage.

Popular services in Salisbury

Nearby areas we cover

Next step

Start on the home page, see finished installs on our work, read customer reviews, or send your Salisbury details through the contact page.

Book a free survey in Salisbury

Whether you are in the cathedral city, Harnham, Wilton or a smallholding out towards Amesbury, send your details and Steve will call you back to arrange a free survey and a fixed written quote, usually within 48 hours.

Steve Higgins · NAPIT registered · RECC registered · OZEV authorised · 2-year workmanship guarantee · Enquire online 24/7 · On site 7am–6pm

Call SteveFree Quote